Minimum Safety Clearance of Pipelines from Electrical Tower:
Description
|
Voltage
|
|
33KV/66KV/132KV
|
220KV/400KV
|
|
The right of way (ROW) (widths on either side of the center line of overhead transmission lines ) |
25 Meter
|
50 Meter
|
Other than the roadways and boundary fences of security establishments any temporary or permanent structures / buildings, parapet walls, |
Not within 25 Meter
|
Not within 50 Meter
|
With All Underground services crossing the way leave (from the nearest tower foundation) |
35 Meter (Min)
|
50 Meter (Min)
|
The nearest side of the road reservation to the nearest tower foundation |
25 Meter
|
35 Meter,50 Meter
|
The pipelines (water, oil/gas etc.) crossing (respectively away from the nearest base of tower leg). Pipe-lines shall not be laid parallel to the overhead line within the limits of a way leave (ROW). |
25 Meter (Min)
|
35 Meter(Min) ,50 Meter(Min)
|
Cables crossing the transmission lines way leave (ROW) respectively away from the nearest base of tower leg. |
25 Meter
|
35 Meter,50 Meter
|
Foundations and civil structures (Temporary or permanent) will not be permitted in the close proximity to the cable circuit. A minimum horizontal distance from such structures to the nearest edge of the cable trench shall be observed |
Min 1.5 Meter
|
Min 1.5 Meter
|
Clearance among Electrical Line-Telephone- Water-Sewerage -Gas Line
Service
|
Vertical Clearance(Min) |
Water Line (to cross below EHV cable level) | 0.5 Meter |
Sewerage Mains (to cross below EHV cable level) | 1.0 Meter |
Drainage Mains (to cross below EHV cable level) | 0.5 Meter |
Gas pipes | 0.6 Meter |
Telephone lines | 0.5 Meter |
LV / 11kV cables | 0.5 Meter |
Safety Clearance for Excavation of Land :
Type of Excavation
|
Distance |
Use of heavy mechanical excavators (other than hand operated pneumatic jack hammers) or driving sheet piles | Not less than 3 Meter from the edge of cable, cover, cable joint |
Heavy machinery engaged in the civil construction or road works | operating load/thrust/ weight will not be applied directly on the cable installation |
Trench excavations parallel to the cable installations | Minimum separation of 1 Meter to the nearest edge of cable tile |
Laying of metal pipes over a long distance parallel to cable | Not permitted unless the Step and Touch Potentials at any point of the pipe line do not exceed 65 Volts. |
(A) Inside Towns
Distance between Tower’s foundation to Pipeline in parallel and intersections.
Voltage
|
Min Distance
|
380/220V
|
0.5 Meter
|
20KV
|
2 Meter
|
63KV
|
7 Meter
|
132KV
|
10 Meter
|
230KV and Above
|
20 Meter
|
Distance between underground power cables to wall of gas pipelines in parallel routes.
Voltage
|
Min Horizontal Distance
|
Min Vertical Distance
|
380/220V
|
1 Meter
|
0.5 Meter
|
20KV
|
2 Meter
|
1 Meter
|
63KV
|
3 Meter
|
1.5 Meter
|
(B) Outside of Towns:
Distance between Tower’s foundation to Pipeline in parallel and intersections.
KV
|
Min Distance in Parallel Route (Up to 5 Km)
|
Min Distance in Parallel Route (Above 5 Km)
|
20KV
|
20 Meter
|
30 Meter
|
63KV
|
30 Meter
|
40 Meter
|
132KV
|
40 Meter
|
50 Meter
|
230KV
|
50 Meter
|
60 Meter
|
400KV
|
60 Meter
|
60 Meter
|
Distance between overhead lines to gas pipelines at intersections.
KV
|
Min Distance
|
20KV
|
8 Meter
|
63KV
|
9 Meter
|
132KV
|
10 Meter
|
230KV
|
11 Meter
|
400KV
|
12 Meter
|
Distance between Tower’s foundations to gas pipelines at intersections.
KV
|
Min Distance
|
20KV
|
20 Meter
|
63KV and Higher
|
30 Meter
|
Right Of Way (R.O.W) From Roads:
Highway
|
Distance
|
High Way : (38 meter from one side of Central Line of Highway) |
76 Meter
|
First Class State Road=(22.5 meter from one side of Central Line of Highway) |
45 Meter
|
Second Class State Road=(17.5 meter from one side of Central Line of Highway) |
35 Meter
|
Third Class State Road =(12.5 meter from one side of Central Line of Highway) |
25 Meter
|
Forth Class State Road=(7.5 meter from one side of Central Line of Highway) |
15 Meter
|
General Electrical Safety Clearance:
KV
|
Description
|
Distance
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Up to 11 KV
|
At points where the lines cross roads or railways
|
Min 6 Meter Height
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Up to 11 KV
|
parallel to roads the
|
Min 5.5 Meter Height
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Up to 11 KV
|
lines cross totally desert regions where no traffic is possible
|
Min 5.5 Meter Height
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20 KV to 66 KV
|
All Location
|
Min 6 Meter Height
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Up to 11 KV
|
Conductor Joint
|
No joint shall be closer than 3 meters to a point of support
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
33 KV & 66 KV |
Conductor Joint
|
No tension joints shall be used unless specially approved.
Minimum clearances between Electrical Lines crossing each other:
Permissible Min ground Clearance of Electrical Line:
Clearance for Telephone line Crossings Power Line:
Vertical Clearance between Electrical Line and railway tracks.
Clearance from Buildings to low, medium & high voltage lines:
Clearance above ground at the lowest conductor:
Vertical Clearance at Middle of Span:
Safety Clearance from Live Part in Outdoor Substation:
Lying of Telecommunication Cables with Power Cables (>33 kV).
Safe approach limits for people:
|